Chemical Facility - Hardwired Safety Instrumented System (SIS) Upgrade
04 March 2015This was an extremely interesting and challenging project, involving detailed planning, site surveys, design, build, test, commissioning, with close liaison with operations on a live facility, with limited process shutdown windows.
read moreMore Case Studies
Aircraft Collision during Taxi for Take off
03 March 2015This case study is not one we have been personally been involved with, but we thought it a good example of qualitative failures (human error) leading to incidents with potential to harm.
read moreOffshore F&G System CFD Analysis
02 March 2015This case study involved a survey of an existing offshore F&G system, which was suffering from equipment obsolescence and failures, leading to parts of the system being bypassed, and leaving some process areaa with reduced detector coverage.
read more